History
The History of
Hume Pack-N-Cool
2008
Store 10 completed with Racking. 10 bulk box fillers installed. 2 pre-cooling units installed. NIR case in full operation. RSE worker scheme trialled.
Store 10 completed with Racking. 10 bulk box fillers installed. 2 pre-cooling units installed. NIR case in full operation. RSE worker scheme trialled.